Ramat Hovav "Teva-Tech" plant - Laboratories for drug development

Ramat Hovav "Teva-Tech" plant - Laboratories for drug development

Designing a structure for special potentic laboratories built of metal and terracotta tiles for rapid construction of laboratories. The structure includes clean rooms with double air locks, a rigid pressure regime, high finish quality of stainless steel and glass walls, terrazzo flooring, structural control and process. Coordination of the planning, issuance of tenders, installation of equipment until full completion and receiving confirmation of occupancy for the building.

The systems included:

  • Construction
  • Electrical systems
  • Air conditioning systems
  • System Coordination
  • Process Control
  • CCTV
  • Fire detection
  • Sprinkler systems
  • Installation of equipment for work with potentic materials
  • Special refining facilities
  • Clean rooms Class 1,000, Class 100
  • structure control
  • Development of land and access roads

Share by: